Bill of Materials: (this is subject to change. Always double check if you choose to use my list. I try to be thorough, but I'm human.
I used
I used
- 5 sticks of Misumi 2020 extrusion (yes from the First 150 promotion) each 1200mm long
- 3 - I cut 342.9mm (13.5") off one end. The remainder is the vertical beams. The other 2 I cut into 342.9mm (13.5") horizontal beams for the base
- 1 pack of 100 3mm pre-interstion t-nuts
- 3 Kysan nema 17 motors
- 1 geared Kysan nema 17 motor
- 3 mechanical endstop switches
- 1 rod kit with the ~12" (305mm) rods, including the 4mm setsrews and Traxxas rod ends
- 6 meters of GT2 belt
- 1 set of 3 16T GT2 pulleys
- 1 set of F623ZZ flanged bearings - if you plan to use Johann's extruder, the mini Kossel bearing kit is what you'll want.
- 1 box of 100 M3 x 8mm stainless socket head screws
- 1 box of 100 M3 x 20mm stainless socket head screws Note: I tried to design all of my parts to use this as the maximum length screw needed.
- 1 box of 100 M3 x 16mm stainless socket head screws
- 1 pack of 100 3mm washers
- 1 machined hob
- 9" build plate